H
|
istorical Review |
Page
|
|
2
|
|
|
5
|
6
|
7 |
Verification
The first
concept of building the Three Gorges Dam was initiated in the
early of the 20th century.Preliminary investigation and planning was done in the
1940s. From the middle of the 1950s to the present, more than 40
years extensive efforts have been made on the planning,
investigation, design and scientific researches for the Three
Gorges Project. Since the project is great in scale and
complicated in technology, involving wide specific fields such as
several scientific and technical disciplines, social economy and
environment
protection. Besides thousands of engineers and
technicians from Changjiang Water Resources Commission (the
Yangtze Valley Planning Office) which is in charge of the
investigation, planning, design and research work of the project,
a large number of experts and scholars from related universities,
research institutes and equipment manufacturers all over the
country have participated in the study of the Project. The
nationwide experts were organized on several occasions for
verification and review of the Project. The reexamination work
lasted three years from 1986 to 1989 with 412 experts from
varieties of fields involved. Since the 1940s, especially since
the 1980s, many experts from such countries as the United States,
Canada, the former Soviet Union, Sweden, Italy, Japan, Belgium,
Switzerland, Germany, France, Brazil, have also participated in
the research and consultation work.
The TGP is grand in magnitude and complicated in technology. The
design for the main structures of the project is classified into
five stages, i.e., feasibility study, preliminary design,
technical design for key individual items, bidding documents and
detailed drawings. The design for the main structures of the
project was undertaken by Changjiang Water Resources Commission (
CWRC) , while specific technical items were consigned to be the
responsibility of related design institutes.
The feasibility study report was completed by CWRC at the end of
1989 . After an overall examination organized by Three Gorges
Project Examination Committee of the State Council, in April 1992,
the Fifth Session of the 7th National People' s Congress passed
the Resolution on the construction of the Three Gorges Project. In
December of the same year, the "preliminary Design Report on the
Three Gorges project" was completed by CWRC and formally approved
in July 1993 after an examination organized by the Three Gorges
Project Construction Committee (TGPCC) of the State Council. The
technical design for the key specific items consists of eight
parts, i.e., dam, powerhouses, permanent shiplocks,vertical
shiplift, stage 2 upperstream cofferdam, mechanical and electrical
equipment and facilities, dam safety monitoring, harbors and
navigation channel regulation in the backwater zone (including
effect of the scouring of the river bed downstream and the
countermeasures). Except for the last item, the technical designs
for seven items have been completed by May of 1995 . The
examination of the design for each individual item, presided by
China Yangtze Three Gorges Project Development Corporation (CTGPC)
with 157 famous experts divided into eight panels, has been
conducted respectively and basically finished by the end of 1995 .
The preparation of the bidding documents and the detailed drawings
were unfolded gradually. By the end of 1995, there were in total
79 major bidding items completed and 8,800 detailed drawings
submitted.

|