photo report
recommended news
search


M
ain Functions & Project Layout
Page
1
2
3
4
5
6

7

Navigation Facilities

 The permanent navigation structures consist of the permanent shiplocks and a shiplift.

The shiplocks are schemed out as a double - way and five - step locks, each lock chamber is dimensioned at 280*34*5 m(i.e. length * width * water depth) capable of passing 10,000 tons of barge fleet.

The shiplift is designed as one stage vertical hoisting type. The ship container of the shiplift is in a size of 120*18*3.5 m, capable of carrying one 3,000 tons of passenger or cargo ship each time.

In addition, one temporary shiplock is schemed for use during the construction period with an effective chamber size of 240*24*4 m.

M
ain Functions & Project Layout
Page
1
2
3
4
5
6

7

 
.Basic Facts
.Social Development
.International Exchanges
.Shopping & Entertainment
.Investment
.Tourism
.Culture

.Natural Scenery

.Historical Remains
.Brief Introduction

>Main Functions &
   Project Layout

.TGP Express
.Historical Review
.Resettlement
.Ecological &
   Environmental Protection
.Cultural Relics
.Gezhouba Dam
.World Records of the TGP

Contact Us กก

Copyright (C) Yichang Municipal People's Government Information Office. All Rights Reserved
Add:52 Shengli Fourth Road, Yichang, Hubei, P R China
E-Mail:ycweb@chinanews.com.cn Phone:86-717-6252524