Project Layout and Hydraulic Structures
Dam Site
After repeated study and analysis on 15 dam site alternatives, the
dam site of the TGP is finally selected at Sandouping with the
crystalline rock as its foundation. The total water catchment
layout of the Three Gorges project area hereof is about one
million km2 with 451 billion m3 of average annual runoff and 530
million tons of annual sediment discharge.
Here at the location of Sandouping dam site, the river valley is
relatively open and broad, the mountains on both sides of the
river are fairly flat with a small islet called Zhongbaodao in the
river, which is favourable for river diversion scheme with phased
construction. As for the outside communications nearby, there
exists a railway to Yichang, with a distance of 40 km to the dam
site and a high standard express from Yichang to the dam site, and
a bridge on the Yangtze River has been constructed and was open to
traffic in 1996. Besides, there are direct accesses by a standard
highway and waterway to the dam site.
The bedrock of the dam site is sound and intact granite with 100
MPa of comprersive strength. The faults and fissures in the
bedrock are less developed and most of them are very well
cemented. And the permeability of the rock mass is slight in
nature. The weathered layers in the hills on both sides are a bit
thick, ranging from 20 to 40 m, while few layers exist on the main
river channel.
In the vicinity of about 15 km around the dam site, there are no
major disadvantageous geologic structures. The regional seismic
activities are small in intensity, low in frequency. Therefore,
the whole area belongs to a slight seismic area ranking as 6
degree of seismic intensity classified by the state authority
department concerned.

กก
Layout of the Project
The The project
is composed of a dam, two power plants and navigation facilities.
For a long time, efforts were engaged in the in-depth study and
research on various schemes to determine the structural pattern,
configuration and layout of the structures. And it was not until
undergoing analysis by scientific researches and tests regarding
hydraulics, sedimentation, structure and material, etc. , that
these issues were finally determined. The overall layout of the
project is as the following.
The spillway is placed in the center of the river bed, i. e. , on
the original main river course, while the intake dam sections and
non-overflow dam sections are arranged on its both sides. The
power plants are placed on the back of the intake dam, and in
addition, an underground power plant on the right bank is to be
built in future. The permanent navigation structures are located
on the left bank side.

กก
Dam
The
dam is of a concrete gravity type. The total length of the dam
axis is 2,309.47m, with the crest elevation at 185 m and a maximum
height of 175 m.
The spillway section, which is located in the middle of the river
course, is 483 m long in total. In this section, there are 23
bottom outlets and 22 surface sluice gates. The dimensions of the
bottom outlets are 7 * 9 m, with the elevation of the inlets at 90
m. The net width of the surface sluice gates is 8 m, with its sill
elevation at 158 m. In the downstream part of this section, flip
bucket for energy dissipation is provided.
On both sides of this section, there will be arranged the intake -
dam and non- overflow dam sections.
The maximum discharge capacity of the Project can reach 116,000