E
|
cological & Environmental Protection |
Page
|
1
|
|
|
4 |
5 |
6
|
7 |
Ecological Protection
Man can survive without
electricity, but not without water. The reservoir may change the
climate of surrounding areas. The temperature of summer and winter
may drop and rise by about 2 ¡æ respectively. This change is more
favourable to the growth of tung trees, orange trees ,chestnut
trees,mulberry trees,etc, which need a warmer climate to live
through the winter. Most of the rare and endangered species of
plants are distributed in the areas above EL300 meters, far above
the maximum flood level,and only very few rare and endangered
animals inhabit the areas to be inundated. A study shows that the
construction of the TGP will have no adverse effect on the living
conditions of Chinese dolphin,Yangtze alligator,giant sela mander,
etc .As we all know,the Gezhouba Dam caused a problem for Chinese
sturgeon .They used to swim all the way upstream to spawn and then
back to their traditional habitat,but the Gezhouba Dam blocks
their way.This problem was successfully solved when the sturgeons
began spawning naturally in the neighbourhood of the Dam with
artificial breeding.The alleviation of flooding along the river's
middle and lower reaches may make it easier to eliminate
oncomelania and snail fever. The reservoir will regulate water
storage and discharge for the need of navigation .Thus downstream
flow will be increased during the dry season, but without causing
any change in the underground water level.Therefore the swamp
process of the valley will not be aggravated. According to the
design,the reservoir is expected to store water in October,which
will result in reduced downstream flows.But in years of ordinary
water flow ,the river's flow is still higher than necessary to
control salt content in Shanghai district.During the period of low
water when sea water makes its most serious increase,the increase
in regulated flows by the dam will have the obvious effect of
diluting salt water and reducing salt content.it is estimated that
after the completion of the Three Gorges Project,the desalination
process of the soil in the river's estuary and surrounding coastal
areas will continue and the water body will be more nutritious.
The
construction of the TGP will not bring Chongqing under the threat
of flood and sediment deposition.According to scientific
experiments ,even the highest flood level occuring at a recurrence
intervals of 1,000 years will not exceed EL 200 metes of the
elevation of Chongqing's Chaotianmen Harbour,while the elevations
of the urban districts are all above EL 200 meters.On the
contrary,the port conditions will be improved without considering
the construction of check dams on the main course upstream
Chongqing even in 100 years.Being a river-type reservoir with an
altitude difference of 120 meters and low sediment content(only
1/30 that of Yellow River), and on account of the operation policy
of "Storing the clear and discharging the turbid",namely "Still
water for navigation and torrential water for sediment
discharge(which is operated mechanically),it can keep 92% of its
regulating storage capacity in 100 years.Along the
1300-kilometer-long reservoir,there exist 22 potential site of
landslide,with a total volume of 0.38 billion m3.Even if all of
them slided into the reservoir ,they would only take up 0.9% of
the total storage capacity. The Dam will be built on granite
bedrocks which extend 110 km along and 70 km across the River.
Furthermore it is designed against earthquakes of magnitude
7,which will protect the Dam from damage of any natural
earthquakes or quakes induced by the reservoir,which, it is
estimated ,will not exceed magnitude 6.As a result,the Project
will act as the guardian for the protection and improvement of
ecological environment of the Yangtze Valley.

|